Welcome
The Florida Department of Transportation (FDOT) is conducting a design-bid-build project at the SR-9/Interstate 95 Gateway Boulevard Interchange and along Gateway Boulevard in the City of Boynton Beach in Palm Beach County. The purpose of the project is to widen, mill and resurface SR 9/I-95 at Gateway Boulevard Interchange (Exit 59) to enhance operational capacity, reduce congestion and increase safety. The project includes work at the I-95 interchange and on Gateway Boulevard from west of High Ridge Road to east of Seacrest Boulevard.
Project At-A-Glance
District
Four
Start Date
Design Phase began in 2017
Current Design Completion / Construction Letting
July 2026
Construction Completion
Summer 2029
Construction Cost
$108M
Length and Limits
The length of the project is about 1 mile on Gateway Boulevard from west of High Ridge Road to east of Seacrest Boulevard, and about 2 miles on SR-9/I-95 from south of the Boynton Canal Bridge to north of the interchange.
Consultant
HNTB Corporation