I-95 Interchange at Gateway Boulevard Design Project
GATEWAY CONSTRUCTION SCHEDULE
Design Began 2017
The project is scheduled for construction. The current letting date is to be determined (unfunded). Construction is expected to last up to 36 months (3 years).